Delivery support

Packing, shipment, warranty, and after-sales support

We confirm delivery details with you before shipment and remain available after delivery.

The final packing method, wooden case, or frame requirement should be locked before shipment.Machine weight and footprint should be used early for forklift, unloading, and installation planning.
Packing Confirm the crate, frame, and anti-rust protection before shipment.
Loading plan Machine footprint, weight, and loading direction should be clear before dispatch.
Your site Confirm voltage, unloading limits, and installation requirements before shipping.
Delivery details See the packing and loading preparation before the machine leaves.

Packing and shipment

Prepare your machine for safe delivery

We discuss packing, loading, shipping, and unloading requirements with you before the machine is dispatched.

Packing details

How the machine is prepared

  • Crate or frame method, anti-rust protection, moisture protection, and spare-parts packing.
  • Machine size, lifting direction, and loading preparation.
  • The final packing and shipment details agreed for your destination.

Before shipment

Details to confirm

  • Destination voltage, unloading limits, floor space, and the receiving contact.
  • Whether you need a frame, wooden case, anti-rust wrapping, or other protection.
  • Surface protection, accessory count, and first-run support.
01

Lead time

Production timing

Confirm the machine type, custom modules, voltage details, and target delivery timing before we prepare your quote.

02

Packing

Export packing confirmation

Review machine dimensions, wrapping, wooden case or frame needs, loading access, and destination requirements before shipment.

03

Shipping

Destination handover details

Share country, port or shipping plan, unloading limits, and local voltage so the team can prepare shipment communication.

04

Installation

Remote commissioning support

Use WhatsApp or email for electrical connection questions, water inlet confirmation, roller direction, pump status, and first-run guidance.

05

Warranty

Warranty and spare parts support

Confirm warranty coverage, wearing parts, and spare-part support so maintenance expectations are clear.

06

After-sales

After-sales contact

Keep communication open after delivery for operation questions, cleaning-effect tuning, maintenance reminders, and future upgrades.

Next step

Send the material, contaminant, daily output, country, and voltage

Partwashline can then provide a machine recommendation, packing plan, and lead-time estimate based on your project.

Interpretation

What to confirm for delivery

  • Confirm machine size, weight, and loading direction before packing.
  • Share destination voltage, unloading limits, and who will receive the machine.
  • Review workshop photos, machine testing, packing, and shipment details together.