Live test video
Real Machine Test Before Delivery
Short footage from a real machine inspection: power connection, electrical cabinet, control panel, roller movement, water tank, valve, and pump operation.
- Electrical cabinet and control panel
- Conveyor rollers and brush contact
- Water tank, valve, and pump operation
Factory location
Factory in Foshan, Guangdong
Communicate directly with the team that prepares industrial cleaning lines, custom tanks, conveyors, and electrical details.
Machine readiness
Pre-shipment machine testing
Test videos and photos can show power connection, control-panel operation, rollers, water tank, pump, and packing status before delivery.
Project documents
Import documents and certificates
Share your import or project requirements early so we can confirm available documents and shipping paperwork.
Export experience
Destination and export market support
Confirm destination country, plant voltage, wooden packing needs, transport handover, and local installation limits before production.
Machine fit
Machine details to confirm
Confirm voltage, cleaning, heating, filtration, drying, conveyor layout, available space, and any sample requirement.
Export packing
Packing and delivery confirmation
Discuss machine dimensions, destination requirements, protective wrapping, loading photos, and transport handover before shipment.
Support channel
WhatsApp and email contact
Send material photos, contamination details, output target, site limits, and destination country for a practical machine recommendation.
After-sales
Warranty and spare parts support
Keep communication open for commissioning questions, use guidance, maintenance advice, and spare-parts coordination after delivery.
Machine test
See the machine before it is packed
The video and photos show the main checks before delivery. Share your part details so we can discuss the setup that suits your process.
What to look for
Key points in the test
- The control panel, electrical cabinet, rollers, water tank, valves, and pump are shown in operation.
- Ask how the setup relates to your material, residue, and surface requirement.
- Use the video together with machine photos and the agreed specification.
- For sensitive surfaces, discuss sample testing before ordering.
For your recommendation
What to send us
- Photos or video of the part, especially the most difficult shape or surface.
- The residue to remove and the finish you need after cleaning.
- Daily output, destination country, voltage, and space available.
- Any requirement for testing, surface protection, packing, or after-sales support.
Order steps
How the order is confirmed, tested, packed, and supported
- 01
Requirement confirmation
Material, contaminant, daily output, site voltage, drying need, available space, and any sample or visible-surface sample check requirement.
- 02
Recommended machine setup
Recommend pressure, tanks, heating, filtration, drying, brush, and conveyor options.
- 03
Assembly
Prepare the cleaning line, electrical cabinet, tanks, rollers, covers, and machine layout.
- 04
Electrical and water test
Inspect power connection, control panel, roller direction, water inlet, pump, and operation status.
- 05
Packing
Confirm wrapping, protection, dimensions, loading details, and destination requirements.
- 06
Delivery
Coordinate shipment details and provide loading photos or dispatch updates where available.
- 07
After-sales support
Support installation questions, use guidance, maintenance reminders, and spare parts.
Interpretation
What to look for in a machine test
- See the machine running before it is packed: controls, rollers, water tank, pump, and operating condition.
- Compare the test with your part, residue, output target, and surface requirement.
- For a recommendation, send part photos, daily output, voltage, and destination country.
- Then review packing, shipment, warranty, and after-sales support.