Factory confidence
Machine testing, factory details, and after-sales support
Review test videos, factory location, inspection points, packing confirmation, warranty, and after-sales support before you request a quotation.
Live test video
Real Machine Test Before Delivery
Short footage from a real machine inspection: power connection, electrical cabinet, control panel, roller movement, water tank, valve, and pump operation.
- Electrical cabinet and control panel
- Conveyor rollers and brush route
- Water tank, valve, and pump operation
Factory location
Factory in Foshan, Guangdong
Communicate directly with the team that prepares industrial cleaning lines, custom tanks, conveyors, and electrical details.
Machine readiness
Pre-shipment machine testing
Test videos and photos can show power connection, control-panel operation, rollers, water tank, pump, and packing status before delivery.
Qualification files
Import documents and certificates
Share your import or project requirements early so the team can confirm available documents and shipment paperwork before pricing.
Export experience
Destination and export market support
Confirm destination country, plant voltage, wooden packing needs, transport handover, and local installation limits before production.
Machine fit
Machine details to confirm
Confirm voltage, cleaning pressure, heating, filtration, drying, conveyor layout, and plant space before final pricing.
Export packing
Packing and delivery confirmation
Discuss machine dimensions, destination requirements, protective wrapping, loading photos, and transport handover before shipment.
Support channel
WhatsApp and email contact
Share material photos, contamination details, output target, and site limits so the team can reply with a practical machine recommendation.
After-sales
Warranty and spare parts support
Keep communication open for commissioning questions, use guidance, maintenance advice, and spare-parts coordination after delivery.
Order steps
How the order is confirmed, tested, packed, and supported
- 01
Requirement confirmation
Material, contaminant, daily output, site voltage, drying need, and available space.
- 02
Recommended machine setup
Recommend pressure, tanks, heating, filtration, drying, brush, and conveyor options.
- 03
Assembly
Prepare the cleaning line, electrical cabinet, tanks, rollers, covers, and machine layout.
- 04
Electrical and water test
Inspect power connection, control panel, roller direction, water inlet, pump, and operation status.
- 05
Packing
Confirm wrapping, protection, dimensions, loading details, and destination requirements.
- 06
Delivery
Coordinate shipment details and provide loading photos or dispatch updates where available.
- 07
After-sales support
Support installation questions, use guidance, maintenance reminders, and spare parts.